CLIENT: MENTER MON

LOCATION: Malltraeth Marsh, Anglesey.

ULTIMATE GOAL: Provide a mostly off-road cycle path eventually from Bodffordd to Newborough, some eight miles.

BACKGROUND:
The provision of a much needed leisure-time cycling facility which is safe and therefore family-orientated.

CHALLENGE: The sideways displacement of a substantial overflow drainage ditch to allow the new cycle path to be sited where the river bed used to be - taking into consideration ecological and wildlife habitats.

DESCRIPTION OF OPERATION: Involves bulk excavation techniques and double-handling of very soft unstable material using the state-of-the-art large capacity pumping equipment and plant machinery.



STAGE 1: SITE BEFORE WORK COMMENCES    
 
     
STAGE 2: EVACUATION OF NEW RIVER CHANNEL    
     
STAGE 3: CONSTRUCTION OF NEW CYCLE TRACK    
     
THE COMPLETED PROJECT    
     